![]() Blue Origin finds last year's failure of the New Shepard cargo mission NS-23 was due to overheating in the rocket's engine nozzle.Virgin Orbit future remains in limbo as volatile deal talks continue: The company extended its furlough for most employees as discussions with a pair of potential investors collapsed over the weekend.Assuming the test flight goes according to plan, then there are the redesigns of Starliner's propulsion valves and module separation system – and potentially batteries – that are underway for missions after CFT. Listening to the press conference yesterday, I found it impossible to believe that NASA and Boeing just realized that launching in three weeks was no longer feasible, especially given the track record of delays.īut we're only finding out about it now, even as Starliner needs to conduct more testing on its parachute system and backup software before CFT gets off the ground. Instead, I'm calling for much needed transparency and clarity about a largely taxpayer-funded development program. I'm not advocating for anything akin to "go fever" for Boeing's upcoming Starliner crewed flight test (CFT), which just got delayed from mid-April to late July. The latter is poised to finish nearly all of its six before the former even flies a crewed demo mission. Boeing and SpaceX each won contracts to fly six operational missions with astronauts. Until they weren't.įast forward to the present. Even then, each company had faced its share of delays, but NASA estimated flight tests were months apart. That sentence holds true this week – but the problem is, I wrote it five years ago.Īt the time, Boeing and SpaceX were seen as neck-and-neck in a race to finish development of their respective crewed spacecraft and be the first to fly NASA astronauts. Personal Loans for 670 Credit Score or Lower Personal Loans for 580 Credit Score or Lower Best Debt Consolidation Loans for Bad Credit
0 Comments
Leave a Reply. |